Tuesday, August 23, 2016

Weed control

We are getting ready for the VSGA Women's Team Matches
and Member/Member by cleaning up some summer weeds.



Picking goose grass

We are almost finished with #8 and have another group walking the rest of the greens.


Monday, August 22, 2016

Goose grass

We've received multiple questions regarding the increased goose grass populations on the putting surfaces.  Goose grass is a summer annual that is currently in the peak of its life cycle.  We address these plants in the spring and early summer with pre emergent control.

It is in my professional opinion that due to increased earl summer rain, these plants had plenty of moisture to germinate.  With the onset of increased temperatures through July and August, our protective barrier was degraded early by hot and humid weather.

Post emergent control can damage vulnerable cool season turf in the heat of summer, hence the reason we have not been aggressive with those post emergent chemistries.

We are not the only course with increased populations of goose grass this summer. Academia is seeing it in multiple locations throughout the southeast and mid-Atlantic.

We are actively hand picking these plants each day to decrease current populations.

With cool weather approaching, this summer annual will not tolerate the cooler temperatures and will start to fade away.





Venting

We continue to see new roots from our weekly venting process.  This agronomic practice increases gas exchange out of the soil profile and supplies necessary oxygen to the plant.


Rain

We had over an inch last night but had 3.5 inches last week.

Better Billy Bunkers worth the investment!



Increased nutsedge

With the rains of late spring and early summer, we've seen increased populations of nutsedge around the course.  

Today we're backpacking around greens and using the big sprayer outside the greens complex. 

We should see die back starting over the next 5 to 7 days.




Wednesday, August 3, 2016

Bridges

The final two bridges have been secured and the walkways installed.

#12

#1